Engineers study the mountain first
Before digging, teams investigate the rock, water, and shape of the route. These conditions help determine the tunnel’s path and the support it will need. 1 2
Machines or controlled blasting remove rock
Some tunnels are dug with large boring machines; others are made by drilling and blasting rock in planned steps. Supports and a lining help keep the tunnel stable. 1 2
Ventilation and drainage are needed
A long tunnel needs ways to move fresh air through it and remove water that seeps in. Engineers plan lighting, emergency exits, and monitoring systems too. These parts help people travel through the tunnel and help workers maintain it. 1 2